Loft Conversion Types Compared: Rooflight, Dormer, Hip-to-Gable

Short answer

The four main loft conversion types are rooflight, rear dormer, hip-to-gable and mansard. A rooflight conversion is cheapest and quickest but adds the least headroom. A rear dormer adds the most usable space for the money and suits most terraces and semis. Hip-to-gable suits houses with a sloping side roof. Mansards add the most space but usually need planning permission.

Loft Conversion Types Compared: Rooflight, Dormer, Hip-to-Gable

First check: is your loft suitable?

Before choosing a type, measure from the top of the ceiling joists to the underside of the ridge timber. Around 2.2 metres or more is the usual starting point for a conversion with comfortable headroom. Less than that is not always a dead end, but it may mean lowering ceilings below or choosing a type that adds height, which costs more.

Roof structure matters as much as height. Older houses typically have traditional cut rafters and purlins, which leave an open void that is easier to convert. Most homes built from the 1960s onwards have trussed rafters, with diagonal timbers crossing the loft. These can be converted, but the trusses must be replaced with a new structure, usually with steel beams, which adds cost and engineering.

The four main types side by side

Each type trades cost against space. The figures below are 2026 guide prices for a typical conversion with one bedroom and, where noted, an en suite. They include structure, insulation, stairs, windows, electrics and decoration.

TypeSpace gainedUsually needs planning?Guide price
Rooflight (Velux)LowRarely£30,000–£40,000
Rear dormerHighOften permitted development£40,000–£55,000
Hip-to-gableHighOften permitted development£50,000–£65,000
MansardVery highUsually yes£55,000–£75,000

Rooflight and dormer conversions

A rooflight conversion keeps the existing roof shape. Windows are set into the slope, the floor is strengthened and the space is insulated and finished. It is the least disruptive option, often taking five to six weeks, and rarely needs planning permission. The downside is headroom: usable standing space is limited to the centre of the room, so it suits a study or a single bedroom more than a main suite.

A rear dormer projects vertically from the back roof slope, creating a box with full-height walls and a flat roof. It turns sloping space into usable floor area and leaves room for a bedroom and an en suite. On terraced and semi-detached houses, a rear dormer is the most common choice and typically takes seven to nine weeks.

Hip-to-gable and mansard conversions

Many semi-detached, end-terrace and detached houses have a hipped roof, where the side slopes in. A hip-to-gable conversion builds that side wall up to a vertical gable, extending the ridge and greatly increasing the floor area. It is often combined with a rear dormer. Because it changes the outline of the house from the street, check whether it falls under permitted development for your property.

A mansard conversion replaces the back roof slope with a near-vertical wall, set back slightly from the eaves, and a flat top. It gives the most space and suits the terraced streets of many cities, but it is a major structural change, almost always needs planning permission and takes the longest, often ten weeks or more.

What every loft conversion must include

Whatever type you choose, a loft conversion is treated as a new habitable room and needs Building Regulations approval. That covers several areas that affect the design and the price, so make sure every quote you compare includes them.

  • New floor joists or steel beams sized by a structural engineer, independent of the existing ceiling joists.
  • A permanent staircase with adequate headroom and pitch; loft ladders are not acceptable for a habitable room.
  • A protected escape route, typically fire doors on rooms off the stairs and interlinked mains-wired smoke alarms.
  • Insulation to current thermal standards in the roof, dormer cheeks and floor.
  • Ventilation to prevent condensation in the roof structure.
  • Party wall notices where the conversion involves shared walls with neighbours.

Common mistakes to avoid

The most common mistake is planning the room before planning the staircase. The stairs have to land somewhere on the floor below, usually by taking space from a bedroom or the landing, and they need adequate headroom along their full length. A conversion with a cramped or awkward stair feels like an add-on and puts buyers off. Agree the stair position at the very first design stage.

The second mistake is underestimating heating and hot water. A new bedroom and en suite add demand to the system, and some older boilers or hot water cylinders struggle. Check that the boiler can cope or budget for an upgrade. Finally, think about storage. The low space behind the knee walls makes useful eaves cupboards if it is planned in, but it is often boarded off and wasted. Small decisions like these make a bigger difference to how the finished room feels than the choice of window brand.

Which type suits your house?

For a mid-terrace with a reasonable roof height, a rear dormer usually gives the best value. For a semi-detached or end-terrace with a hipped roof, hip-to-gable with a rear dormer creates the largest room and often space for a bathroom. Detached houses with plenty of height may only need rooflights. Mansards make sense where planning policy allows them and you want the maximum space, particularly on city terraces where gardens are too small for a ground floor extension. A survey and an early conversation with a designer will confirm which options are realistic for your roof.

Questions people also ask

How long does a loft conversion take?

Most loft conversions take six to ten weeks on site. Rooflight conversions are quickest, at around five to six weeks. Dormers usually take seven to nine weeks, and hip-to-gable or mansard conversions can take ten weeks or more. Design and approvals beforehand typically add one to three months, depending on whether planning permission is needed.

Can every loft be converted?

Not every loft is suitable without extra work. Low head height, a very shallow roof pitch, water tanks or chimney stacks in the way, and trussed rafter roofs can all add cost. Most issues can be solved, for example by lowering ceilings or replacing trusses with steels, but sometimes the cost outweighs the benefit.

Does a loft conversion add value?

Adding a bedroom, especially with an en suite, often adds meaningful value, because bedroom count strongly drives house prices. The gain depends on local ceiling prices and the quality of the conversion. A well-planned staircase that feels like part of the house adds more value than one squeezed into a bedroom.