PK Property Improvements

PK Property Improvements

Rendering and Roofing

Sand and cement, silicone and monocouche render, plus re-roofing, flat roof replacement, chimney work and storm repairs.

Free Property Improvements quote

No obligation. We only use your details to reply about this job.

Rendering and Roofing — PK Property Improvements

What's involved

Rendering starts with scaffold, removal of failed render back to sound masonry, and beads at corners, windows and the base. Sand and cement render needs painting and can crack over time; through-coloured silicone and monocouche renders are more flexible, shed dirt better and do not need repainting. Render should not go on in frost or heavy rain, so autumn and winter jobs need careful planning. On roofs we carry out full strip and re-tile or re-slate, replacing battens and breathable membrane, plus flat roof replacement in EPDM rubber, GRP fibreglass or torch-on felt. A typical terraced house re-roof takes five to eight days. Chimney repointing, flashing replacement and ridge re-bedding are common add-ons once scaffold is up. Older solid-wall homes may need breathable lime render instead of cement to avoid trapping damp.

How we handle it

  1. Tell us about the job

    Use the quote form to describe the work, the property type and your timing. Photos, drawings or a rough sketch help. For rental properties, tell us when the tenancy ends and whether the property will be empty.

  2. Survey and scope

    A surveyor or lead tradesperson visits to measure up, check structure, access, drainage and services, and talk through finishes. For extensions and lofts we confirm whether drawings, planning or Building Regulations approval are needed before anything is priced.

  3. Written, itemised quote

    You receive a written quote that breaks the job into stages, lists what is included and excluded, and sets out provisional sums for anything that cannot be priced until opened up, such as hidden rot or old wiring.

  4. Planned and sequenced work

    We book trades in the right order, arrange skips, scaffold and deliveries, and agree working hours and protection for floors and furniture. You get one point of contact for questions and updates throughout the job.

  5. Snagging and sign-off

    At the end we walk round with you and list any snags, which are put right before the job is signed off. Certificates for electrical, gas and Building Regulations work are passed to you for your records.

Price guide

Every project is priced after a survey, because structure, access and finishes change costs more than size alone. Quotes are split into stages, with provisional sums only where something cannot be seen until work starts. The figures below are 2026 UK guide prices for typical jobs; London and the South East usually sit at the upper end.

  • External rendering (semi-detached house): £7,000–£14,000. Includes scaffold, removal of failed render, beads and a through-coloured silicone or monocouche finish.
  • Between-tenancy refurbishment (two-bed flat): from £2,500. Full repaint, minor repairs and flooring; kitchen or bathroom refreshes and compliance work quoted on top.
  • Single storey rear extension (around 20 m²): £45,000–£75,000. Built to a plastered, decorated shell with electrics and heating; kitchen fit and specialist glazing priced separately.

Questions about rendering and roofing

What is the difference between sand and cement render and silicone render?

Sand and cement render is a traditional mix that is cheaper to apply but needs painting and can crack as the building moves. Silicone render is a thin, through-coloured coat that is more flexible, water repellent and self-cleaning to a degree, so it does not need repainting. Silicone costs more upfront but usually needs less maintenance over its life.

Can you refurbish a rental property between tenants?

Yes. We plan void work around a short turnaround, starting with a check-out walk-round and a fixed list of tasks. A typical refresh covers repainting, flooring, repairs, cleaning up mould and minor kitchen or bathroom work, and on a two-bedroom flat it often takes four to seven working days. We can also coordinate safety checks and certificates.

How long does a kitchen refit take?

A full kitchen refit usually takes two to three weeks from strip-out to finished decoration. Strip-out and first fix take the first few days, followed by plastering, unit fitting and appliances. Stone or quartz worktops add about a week because they are templated once the units are fixed. Simple like-for-like replacements with laminate worktops can be done in under a week.

Get a free property improvements quote

Tell us what you need and we'll come back with a clear price.

Request a quote