Property Improvements glossary
The terms you'll come across, explained in plain English.
- Building Regulations
- Legal minimum standards for how building work is carried out, covering structure, fire safety, insulation, ventilation, drainage and electrics. Approved by council building control or a registered approver.
- Building warrant
- The approval required in Scotland before starting most building work, such as extensions and loft conversions, issued by the local council's building standards team.
- Completion certificate
- The document issued by building control confirming that building work meets the Building Regulations. Buyers' solicitors ask for it when you sell.
- Dormer
- A box-shaped structure projecting vertically from a sloping roof, adding headroom and floor space in a loft conversion.
- First fix
- The stage where cables, pipes and studwork go in before walls are plastered, such as running electrics and plumbing to their final positions.
- Hip-to-gable
- A loft conversion that replaces a sloping side roof with a vertical gable wall, extending the ridge and increasing usable loft space.
- Monocouche render
- A single-coat, through-coloured cement-based render applied by machine or hand that does not need painting once finished.
- Padstone
- A solid block of concrete or engineering brick placed under the end of a steel beam to spread its load safely into the wall below.
- Party wall notice
- Formal written notice to a neighbour, required by the Party Wall etc. Act 1996 in England and Wales, before certain work on or near a shared wall or boundary.
- Permitted development
- National rights that let homeowners carry out certain extensions and alterations to houses without applying for full planning permission, within set limits on size, height and materials.
- Provisional sum
- An allowance in a quote for work that cannot be accurately priced until opened up, such as foundation depth or hidden rot.
- RSJ
- Rolled steel joist, a steel beam used to support walls or floors when an opening is made, such as knocking through into an extension.
- Second fix
- The stage after plastering where visible items are fitted, such as sockets, switches, radiators, doors, skirting and sanitaryware.
- Tanking
- Applying a waterproof membrane or coating to walls and floors in showers and wet rooms before tiling, because tiles and grout are not waterproof.
- Void period
- The time a rental property stands empty between tenancies, during which the landlord earns no rent but still pays running costs.
Get a free property improvements quote
Tell us what you need and we'll come back with a clear price.
Request a quote