PK Property Improvements FAQs
Straight answers to the questions we're asked most.
How much does a single storey extension cost in the UK?
A single storey rear extension of around 20 square metres typically costs £45,000 to £75,000 in 2026, built to a plastered and decorated finish. The price rises with steels for knock-throughs, bifold or sliding doors, rooflights and high-end finishes. London and the South East sit at the top of the range. Kitchens fitted into the new space are usually priced separately.
Do I need planning permission for a loft conversion?
Often not. Many loft conversions in England fall under permitted development, provided they stay within volume limits, do not extend beyond the front roof slope and use similar materials. Flats, listed buildings and homes in conservation areas need permission. Building Regulations approval is needed for every loft conversion, because it covers structure, fire escape, stairs and insulation.
How long does a kitchen refit take?
A full kitchen refit usually takes two to three weeks from strip-out to finished decoration. Strip-out and first fix take the first few days, followed by plastering, unit fitting and appliances. Stone or quartz worktops add about a week because they are templated once the units are fixed. Simple like-for-like replacements with laminate worktops can be done in under a week.
Can you refurbish a rental property between tenants?
Yes. We plan void work around a short turnaround, starting with a check-out walk-round and a fixed list of tasks. A typical refresh covers repainting, flooring, repairs, cleaning up mould and minor kitchen or bathroom work, and on a two-bedroom flat it often takes four to seven working days. We can also coordinate safety checks and certificates.
What is the difference between sand and cement render and silicone render?
Sand and cement render is a traditional mix that is cheaper to apply but needs painting and can crack as the building moves. Silicone render is a thin, through-coloured coat that is more flexible, water repellent and self-cleaning to a degree, so it does not need repainting. Silicone costs more upfront but usually needs less maintenance over its life.
Can I live in the house during an extension or loft conversion?
Usually, yes. Most of an extension is built outside the existing house, and the knock-through happens late, behind dust sheets. Loft conversions are mostly worked from scaffold, with the stair opening formed near the end. Expect noise, dust and some days without water or power. Kitchen and bathroom refits are harder to live with, so plan alternatives.
How long does a new roof last?
A well-fitted concrete tile roof typically lasts 50 years or more, natural slate can last much longer, and clay tiles sit in between. Flat roofs vary: EPDM rubber and GRP fibreglass commonly last 25 years or more, while traditional felt is shorter. Battens, membrane, flashing and ridge mortar usually fail before the tiles themselves, which is why re-roofing replaces them.
Do I need to tell my neighbours about building work?
If your work involves a shared wall, building on the boundary or digging foundations close to a neighbour's, the Party Wall etc. Act 1996 requires you to serve notice in England and Wales. Notice periods are one or two months depending on the work. Even where it is not required, telling neighbours about skips, scaffold and working hours avoids friction.
Will you work with my architect's drawings?
Yes. If you already have drawings, planning approval or structural calculations, we price from those and raise any buildability questions early. If you do not, we can arrange measured drawings, structural design and the Building Regulations application as part of the project, so you are not chasing separate consultants yourself.
What happens if you find hidden problems once work starts?
Older houses often reveal rotten joists, failed lintels, damp or old wiring once floors and walls are opened up. When that happens we stop, show you photos, explain the options and price the extra work in writing before carrying on. Quotes include provisional sums for the likeliest unknowns, so surprises are smaller and expected rather than open-ended.
How do I reduce the void period on a rental property?
Book the walk-round before the tenant leaves, agree the work list and order materials in advance, so trades can start the day the property is empty. Choosing durable, standard finishes such as vinyl flooring and wipeable paint speeds things up and reduces wear next time. Running safety checks during the same window avoids a second visit.
Are your tradespeople insured?
Yes. The work is carried out by vetted local tradespeople who carry public liability insurance. Gas work is done by Gas Safe registered engineers and electrical work by qualified electricians who can certify it. You receive the relevant certificates at the end, which you will need when you sell the house or for landlord compliance records.