PK Property Improvements

PK Property Improvements

Loft Conversions

Velux, dormer, hip-to-gable and mansard loft conversions that add a bedroom and bathroom without losing garden space.

Free Property Improvements quote

No obligation. We only use your details to reply about this job.

Loft Conversions — PK Property Improvements

What's involved

The first check is head height: you generally want at least 2.2 metres from the top of the ceiling joists to the underside of the ridge. From there we confirm the type of conversion. A rooflight conversion keeps the roof shape and is the quickest; a rear dormer adds the most usable floor area; hip-to-gable suits semi-detached and end-terrace houses with a sloping side. New floor joists or steels carry the room, a staircase is designed to meet the Building Regulations for headroom and pitch, and fire safety is addressed with fire doors and mains-wired smoke alarms on the escape route. Most conversions take 6 to 10 weeks, with the internal staircase opening formed near the end. Expect to clear the loft completely before work begins and to have scaffold on the house for most of the job.

How we handle it

  1. Tell us about the job

    Use the quote form to describe the work, the property type and your timing. Photos, drawings or a rough sketch help. For rental properties, tell us when the tenancy ends and whether the property will be empty.

  2. Survey and scope

    A surveyor or lead tradesperson visits to measure up, check structure, access, drainage and services, and talk through finishes. For extensions and lofts we confirm whether drawings, planning or Building Regulations approval are needed before anything is priced.

  3. Written, itemised quote

    You receive a written quote that breaks the job into stages, lists what is included and excluded, and sets out provisional sums for anything that cannot be priced until opened up, such as hidden rot or old wiring.

  4. Planned and sequenced work

    We book trades in the right order, arrange skips, scaffold and deliveries, and agree working hours and protection for floors and furniture. You get one point of contact for questions and updates throughout the job.

  5. Snagging and sign-off

    At the end we walk round with you and list any snags, which are put right before the job is signed off. Certificates for electrical, gas and Building Regulations work are passed to you for your records.

Price guide

Every project is priced after a survey, because structure, access and finishes change costs more than size alone. Quotes are split into stages, with provisional sums only where something cannot be seen until work starts. The figures below are 2026 UK guide prices for typical jobs; London and the South East usually sit at the upper end.

  • External rendering (semi-detached house): £7,000–£14,000. Includes scaffold, removal of failed render, beads and a through-coloured silicone or monocouche finish.
  • Bathroom renovation: £6,000–£12,000. Mid-range family bathroom including sanitaryware, tanking, tiling, electrics and an extractor fan.
  • Kitchen refit (labour and fitting): £4,500–£9,000. Strip-out, first fix alterations, plastering, fitting and tiling. Units, worktops and appliances are extra or can be supplied.

Questions about loft conversions

What is the difference between sand and cement render and silicone render?

Sand and cement render is a traditional mix that is cheaper to apply but needs painting and can crack as the building moves. Silicone render is a thin, through-coloured coat that is more flexible, water repellent and self-cleaning to a degree, so it does not need repainting. Silicone costs more upfront but usually needs less maintenance over its life.

What happens if you find hidden problems once work starts?

Older houses often reveal rotten joists, failed lintels, damp or old wiring once floors and walls are opened up. When that happens we stop, show you photos, explain the options and price the extra work in writing before carrying on. Quotes include provisional sums for the likeliest unknowns, so surprises are smaller and expected rather than open-ended.

How long does a kitchen refit take?

A full kitchen refit usually takes two to three weeks from strip-out to finished decoration. Strip-out and first fix take the first few days, followed by plastering, unit fitting and appliances. Stone or quartz worktops add about a week because they are templated once the units are fixed. Simple like-for-like replacements with laminate worktops can be done in under a week.

Get a free property improvements quote

Tell us what you need and we'll come back with a clear price.

Request a quote