Guide · Homeowners · 4 min read · Updated 17 November 2026
How Much Does a House Extension Cost in the UK in 2026?
Short answer
A single storey rear extension of around 20 square metres typically costs £45,000 to £75,000 in the UK in 2026, built to a plastered, decorated shell with heating and electrics. That works out at roughly £2,200 to £3,700 per square metre. Double storey extensions cost more in total but less per square metre. Kitchens, specialist glazing and professional fees are usually on top.
Typical extension prices in 2026
Extension prices are best understood per square metre, then adjusted for the things that make your project different. A simple single storey rear extension with a flat or lean-to roof, standard windows and a basic finish sits at the lower end. Add a pitched roof with vaulted ceiling, a run of bifold or sliding doors, rooflights and underfloor heating, and you move quickly towards the top of the range. Double storey extensions share one set of foundations and one roof between two floors, so the cost per square metre falls even though the total rises.
The figures below are guide prices for a shell finished to plaster, with first and second fix electrics, heating and decoration. They assume reasonable access and normal ground conditions.
| Extension type | Typical size | Guide price |
|---|---|---|
| Single storey rear | 15–25 m² | £45,000–£75,000 |
| Single storey side return | 8–15 m² | £30,000–£55,000 |
| Wraparound (side and rear) | 25–40 m² | £70,000–£120,000 |
| Double storey rear or side | 30–45 m² over two floors | £80,000–£140,000 |
What is included and what is extra
Most builders' extension prices cover the structure and a decorated interior but stop short of the things that make the room usable. Be clear on what you are comparing when you collect quotes, because two numbers that look far apart can describe very different scopes of work.
Professional fees are easy to forget. Measured drawings, structural calculations, the Building Regulations application and any planning fee typically add several thousand pounds before a spade goes in the ground. If a party wall surveyor is needed, their fees are paid by the person building the extension.
- Usually included: foundations, walls, roof, windows and standard doors, insulation, plastering, electrics, radiators and decoration.
- Often extra: a new kitchen, bifold or sliding doors, rooflights and lantern lights, underfloor heating and flooring.
- Fees: architectural drawings, structural engineer, building control charges, planning application and party wall surveyors.
- Hidden extras: steel beams for knock-throughs, moving drains, deeper foundations near trees and skip or scaffold licences.
The factors that push the price up
Ground conditions are the biggest unknown. Clay soil, nearby trees and old drains can all force deeper or specially designed foundations. A public sewer running under the footprint may need an agreement with the water company to build over or near it, which takes time and adds cost.
Opening the back of the house into the new space usually means a steel beam, sometimes with padstones or new columns. The more wall you remove, the larger and more expensive the steel. Glazing is the other big driver: a five-metre run of aluminium sliding doors can cost as much as the walls around it.
Access and location complete the picture. A mid-terrace with no rear access means every block, bag of cement and length of timber comes through the house, adding labour days. Labour rates in London and the South East are noticeably higher than in the North, the Midlands or Wales, and that difference shows directly in the final price.
How long an extension takes
A typical single storey rear extension takes 10 to 16 weeks on site, after drawings and approvals are in place. Allow two to four months beforehand for design, structural calculations and either a permitted development check or a planning decision. Double storey extensions usually take 16 to 24 weeks on site. Weather affects groundworks, brickwork and roofing, so winter starts can run longer.
The order of work is foundations and drainage, slab, walls, roof, windows and doors, first fix services, insulation and plaster, second fix and decoration. The knock-through into the existing house normally happens near the end, behind dust screens, so you can keep using your home for as long as possible.
Cost breakdown by stage
It helps to see where the money goes, because it shows which decisions have the biggest effect on the total. On a typical single storey rear extension, groundworks and foundations take a sizeable share, especially where clay or tree roots push foundations deeper. The shell, meaning walls, roof structure and roof covering, is usually the largest single block of cost. Windows and external doors vary more than any other item, because a standard window and door set and a full-width run of aluminium sliders are worlds apart.
Internal work, including first fix electrics and plumbing, insulation, plastering, second fix and decoration, makes up the rest. A builder who can show you this kind of breakdown is easier to work with, because you can see exactly what changes if you swap a pitched roof for a flat one or reduce the glazing. It also makes payment stages simple to agree, since each stage matches a visible milestone on site.
How to keep your extension on budget
The most effective way to protect your budget is to decide on finishes before the build starts. Changing a door specification or a roof window halfway through means new orders, delays and variations. Ask for a staged, itemised quote with provisional sums for unknowns such as foundation depth, so you can see where the risk sits rather than getting a single figure with no breakdown.
Keep a contingency of around 10 to 15 per cent of the build cost for things nobody could see in advance. Simple rectangular shapes with a standard roof are cheaper to build than complex footprints with multiple corners. Reusing the existing kitchen layout and drain runs where possible, rather than moving everything, also saves money. Finally, compare quotes like for like: the cheapest number often excludes things the others included.
Questions people also ask
Is it cheaper to extend or move house?
It depends on local property prices and moving costs. Stamp duty, estate agent and legal fees and removals can easily total tens of thousands of pounds, which is money that adds nothing to your home. Extending usually makes sense if you like the area and the extension cost plus your current value does not exceed what similar larger homes on your street sell for.
Does an extension add value to a house?
A well-designed extension that adds a bedroom or a large kitchen-diner usually adds value, though it does not always recover the full cost. The gain depends on the ceiling price for your street, the quality of the finish and how well the new space flows into the existing house. A local estate agent can tell you the likely ceiling before you commit.
How much does a double storey extension cost?
A double storey extension of 30 to 45 square metres over two floors typically costs £80,000 to £140,000 in 2026. The cost per square metre is lower than a single storey extension because the foundations and roof are shared across two floors. It almost always needs full planning permission rather than permitted development.
Written and checked by the PK Property Improvements team. Read our editorial policy.
More guides
Do I Need Planning Permission for an Extension? UK Rules Explained
Many single storey rear extensions on houses in England can be built without planning permission under permitted development, provided they stay…
Loft Conversion Types Compared: Rooflight, Dormer, Hip-to-Gable
The four main loft conversion types are rooflight, rear dormer, hip-to-gable and mansard. A rooflight conversion is cheapest and quickest but adds…
Rental Property Refurbishment Checklist for UK Landlords
Between tenancies, a landlord should check safety first, then repair, then refresh. That means a valid gas safety record, an electrical inspection…
How to Choose a Builder for Home Improvements in the UK
Choose a builder who visits to survey before pricing, gives a written itemised quote, carries public liability insurance and can show recent similar…